# Wave 2 - Post-MVP Backlog Wave 2 starts only after MVP pilot sign-off is complete and Gate 4 is formally closed. This document captures the first prioritized expansion backlog so pilot defects and new features do not mix. ## Priority Order ### 1. LDAP / SSO Goal: - replace local-only auth as the primary enterprise login path Expected outputs: - LDAP or SSO integration design - role mapping rules - operational runbook for identity integration Acceptance: - enterprise login works without breaking current RBAC behavior - fallback admin access is documented ### 2. Additional Channels Goal: - expand beyond the current MVP channel baseline Expected outputs: - `webchat` handling flow - `email` intake flow - external messenger backlog after `webchat` and `email` Acceptance: - new channels reuse the unified interaction model - routing, history, and KPI ingestion stay consistent ### 3. Dedicated Supervisor/Admin UI Goal: - move beyond the single operator shell and provide dedicated operational consoles Expected outputs: - supervisor UI for realtime monitoring, control, and reporting - admin UI for users, queues, rules, and configuration Acceptance: - critical supervisor and admin workflows no longer depend on the operator shell ### 4. Recording and Audio Operations Goal: - turn the current event-level recording placeholders into a usable product block Expected outputs: - recording storage model - playback/download flow - access control and retention rules Acceptance: - supervisors can find, review, and export recording artifacts safely ### 5. Advanced IVR and Voice Flow Goal: - introduce configurable IVR flows beyond current baseline voice event intake Expected outputs: - IVR flow model - editable configuration or builder - routing integration for IVR outcomes Acceptance: - IVR outcomes are traceable in interaction lifecycle and routing decisions ### 6. Full KPI Catalog Goal: - expand reporting from MVP core KPIs to the wider target metric model Expected outputs: - KPI mapping backlog based on the extended specification - data model updates - report coverage matrix Acceptance: - KPI definitions are reproducible and traceable to the specification ### 7. Scale-Up and Hardening Goal: - move from MVP pilot performance to target production scale Expected outputs: - capacity plan - higher load targets - scale validation on the target deployment profile Acceptance: - agreed performance target is met with documented evidence ### 8. Event Bus and Integrations Goal: - evolve the platform from contract-ready integration to operational event exchange Expected outputs: - message bus integration design - service event publishing/consumption plan - external integration sequencing Acceptance: - core domain events are delivered through the selected bus without contract drift ## Delivery Rules - Wave 2 must be planned as a separate delivery track from MVP pilot closure. - MVP defects remain in the MVP remediation lane until sign-off is complete. - New Wave 2 scope is approved only after MVP accepted baseline is frozen. ## Status Update (2026-03-05) - Track 9 (Asterisk AMI lab bridge) is accepted in QA evidence packs. - Track 9.2 cutover prep is ready; production execute requires target context/secrets window. - Track 10 is closed: - see `docs/acceptance/track10/track10-acceptance.md`. - Next execution step: Track 11 (live voice control scope).