Wave 2 - Post-MVP Backlog

Wave 2 starts only after MVP pilot sign-off is complete and Gate 4 is formally closed. This document captures the first prioritized expansion backlog so pilot defects and new features do not mix.

Priority Order

1. LDAP / SSO

Goal:

  • replace local-only auth as the primary enterprise login path

Expected outputs:

  • LDAP or SSO integration design
  • role mapping rules
  • operational runbook for identity integration

Acceptance:

  • enterprise login works without breaking current RBAC behavior
  • fallback admin access is documented

2. Additional Channels

Goal:

  • expand beyond the current MVP channel baseline

Expected outputs:

  • webchat handling flow
  • email intake flow
  • external messenger backlog after webchat and email

Acceptance:

  • new channels reuse the unified interaction model
  • routing, history, and KPI ingestion stay consistent

3. Dedicated Supervisor/Admin UI

Goal:

  • move beyond the single operator shell and provide dedicated operational consoles

Expected outputs:

  • supervisor UI for realtime monitoring, control, and reporting
  • admin UI for users, queues, rules, and configuration

Acceptance:

  • critical supervisor and admin workflows no longer depend on the operator shell

4. Recording and Audio Operations

Goal:

  • turn the current event-level recording placeholders into a usable product block

Expected outputs:

  • recording storage model
  • playback/download flow
  • access control and retention rules

Acceptance:

  • supervisors can find, review, and export recording artifacts safely

5. Advanced IVR and Voice Flow

Goal:

  • introduce configurable IVR flows beyond current baseline voice event intake

Expected outputs:

  • IVR flow model
  • editable configuration or builder
  • routing integration for IVR outcomes

Acceptance:

  • IVR outcomes are traceable in interaction lifecycle and routing decisions

6. Full KPI Catalog

Goal:

  • expand reporting from MVP core KPIs to the wider target metric model

Expected outputs:

  • KPI mapping backlog based on the extended specification
  • data model updates
  • report coverage matrix

Acceptance:

  • KPI definitions are reproducible and traceable to the specification

7. Scale-Up and Hardening

Goal:

  • move from MVP pilot performance to target production scale

Expected outputs:

  • capacity plan
  • higher load targets
  • scale validation on the target deployment profile

Acceptance:

  • agreed performance target is met with documented evidence

8. Event Bus and Integrations

Goal:

  • evolve the platform from contract-ready integration to operational event exchange

Expected outputs:

  • message bus integration design
  • service event publishing/consumption plan
  • external integration sequencing

Acceptance:

  • core domain events are delivered through the selected bus without contract drift

Delivery Rules

  • Wave 2 must be planned as a separate delivery track from MVP pilot closure.
  • MVP defects remain in the MVP remediation lane until sign-off is complete.
  • New Wave 2 scope is approved only after MVP accepted baseline is frozen.

Status Update (2026-03-05)

  • Track 9 (Asterisk AMI lab bridge) is accepted in QA evidence packs.
  • Track 9.2 cutover prep is ready; production execute requires target context/secrets window.
  • Track 10 is closed:
    • see docs/acceptance/track10/track10-acceptance.md.
  • Next execution step: Track 11 (live voice control scope).