3.3 KiB
3.3 KiB
Wave 2 - Post-MVP Backlog
Wave 2 starts only after MVP pilot sign-off is complete and Gate 4 is formally closed. This document captures the first prioritized expansion backlog so pilot defects and new features do not mix.
Priority Order
1. LDAP / SSO
Goal:
- replace local-only auth as the primary enterprise login path
Expected outputs:
- LDAP or SSO integration design
- role mapping rules
- operational runbook for identity integration
Acceptance:
- enterprise login works without breaking current RBAC behavior
- fallback admin access is documented
2. Additional Channels
Goal:
- expand beyond the current MVP channel baseline
Expected outputs:
webchathandling flowemailintake flow- external messenger backlog after
webchatandemail
Acceptance:
- new channels reuse the unified interaction model
- routing, history, and KPI ingestion stay consistent
3. Dedicated Supervisor/Admin UI
Goal:
- move beyond the single operator shell and provide dedicated operational consoles
Expected outputs:
- supervisor UI for realtime monitoring, control, and reporting
- admin UI for users, queues, rules, and configuration
Acceptance:
- critical supervisor and admin workflows no longer depend on the operator shell
4. Recording and Audio Operations
Goal:
- turn the current event-level recording placeholders into a usable product block
Expected outputs:
- recording storage model
- playback/download flow
- access control and retention rules
Acceptance:
- supervisors can find, review, and export recording artifacts safely
5. Advanced IVR and Voice Flow
Goal:
- introduce configurable IVR flows beyond current baseline voice event intake
Expected outputs:
- IVR flow model
- editable configuration or builder
- routing integration for IVR outcomes
Acceptance:
- IVR outcomes are traceable in interaction lifecycle and routing decisions
6. Full KPI Catalog
Goal:
- expand reporting from MVP core KPIs to the wider target metric model
Expected outputs:
- KPI mapping backlog based on the extended specification
- data model updates
- report coverage matrix
Acceptance:
- KPI definitions are reproducible and traceable to the specification
7. Scale-Up and Hardening
Goal:
- move from MVP pilot performance to target production scale
Expected outputs:
- capacity plan
- higher load targets
- scale validation on the target deployment profile
Acceptance:
- agreed performance target is met with documented evidence
8. Event Bus and Integrations
Goal:
- evolve the platform from contract-ready integration to operational event exchange
Expected outputs:
- message bus integration design
- service event publishing/consumption plan
- external integration sequencing
Acceptance:
- core domain events are delivered through the selected bus without contract drift
Delivery Rules
- Wave 2 must be planned as a separate delivery track from MVP pilot closure.
- MVP defects remain in the MVP remediation lane until sign-off is complete.
- New Wave 2 scope is approved only after MVP accepted baseline is frozen.
Status Update (2026-03-05)
- Track 9 (Asterisk AMI lab bridge) is accepted in QA evidence packs.
- Track 9.2 cutover prep is ready; production execute requires target context/secrets window.
- Track 10 is closed:
- see
docs/acceptance/track10/track10-acceptance.md.
- see
- Next execution step: Track 11 (live voice control scope).