16 lines
533 B
Markdown
16 lines
533 B
Markdown
# P1/P2 Defect Register (Pilot)
|
|
|
|
Last update: 2026-02-27 (UAT-DRY-20260227_085446)
|
|
|
|
## Current Status
|
|
- Open P1: 0
|
|
- Open P2: 0
|
|
- Source: `scripts/uat_dry_run.py` and automated checks
|
|
- Latest dry-run evidence: `docs/uat/evidence/dry_run_UAT-DRY-20260227_085446/`
|
|
|
|
## Triage Policy
|
|
- Only `P1` and `P2` issues belong to MVP remediation.
|
|
- `P3` and `P4` issues move to `docs/roadmap/05-wave2-backlog.md` unless they block sign-off.
|
|
|
|
## Pilot Note
|
|
- Final P1/P2 closure is confirmed only after the real-operator UAT cycle and sign-off. |