# Stage 4 - Pilot Hardening + Acceptance (Weeks 11-12)
|
|
|
|
## Goal
|
|
Stabilize and pass pilot acceptance.
|
|
|
|
## Scope
|
|
- load tests up to 100/100
|
|
- backup/restore drills
|
|
- security hardening checks
|
|
- UAT protocol and defect closure (P1/P2)
|
|
- final documentation pack
|
|
|
|
## Deliverables
|
|
- test protocols
|
|
- UAT evidence
|
|
- operational runbooks
|
|
- accepted MVP v1 baseline
|
|
|
|
## Gate 4 DoD
|
|
- Pilot passed
|
|
- SLA/KPI acceptance criteria confirmed
|
|
- System ready for post-MVP expansion
|